![]() Using Teamcenter Verification Management for traceability and workflow management Folder ManagementĪnalysts often prefer to organize their simulation data in hierarchical folders on their operating system. These include critical analyses performed, measured parameters values, and summary reports. ![]() In addition, simulation teams communicate their results and reports to the program manager level through a verification request as well. A view on the Digital Thread: Complete traceability from requirements to results.To have clear visibility on the status of simulations.To communicate all the necessary inputs to different simulation teams through a Verification Request: requirements, system models, product BOMs, associated parameters and more. ![]() With Active Workspace 5.2, Teamcenter Simulation together with Verification Management enables program managers: ![]() Collectively, there is a lack of a clear digital thread connecting requirements to simulation results. In addition, the program manager lacks visibility on the status of the simulations. Sometimes they must access this information from a different system than where they are managing their simulation data. Simulation teams often receive the requirements (system models, design data) in an ad-hoc fashion, such as via email or on a shared drive.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |